Open Precompile-EVM Repository in a Github Codespace
Open a Codespace on the Precompile-EVM Repository on the avalanche-academy-start branch by clicking the button below:
Next a window opens and the Codespace is built. This may take a few minutes.

When the building is completed, you can access the Codespace through the browser IDE.
Closing Codespaces
The codespace time out after 30 minutes of inactivity by default. So if you are not too worried about the 30 hour/month limit, just close the window or the tab. Alternatively, you can open the command prompt (Cmd + Shift + P) and issue the command: Stop Current Codespace.

Reopen Codespaces
You can see your Codespaces on https://github.com/codespaces/. There you can stop them, reopen them and delete them.